  • Create a manufacturing order

  • Confirm an order and check component availability

  • Start production and record produced quantities

  • Complete a manufacturing order and handle the backorder

  • Following work orders at work centers

  • Cancel a manufacturing order

  • Check warehouse stock for components, finished products and minimum levels

All modules

Start production and record produced quantities

Manufacturing · 11 of 15 · 4 min read

A confirmed manufacturing order starts when production begins. Then you record produced quantities as they are made, such as the jars of jam filled in a day.

Before starting: when to use Start and when to use Produce

The page of a Confirmed order shows both Start and Produce.

  • If production is starting but you do not have finished quantities yet, use Start: the order moves to In Progress and Actual start is filled in.
  • If you already have finished quantities, use Produce directly: recording a quantity on a Confirmed order moves it to In Progress on its own and fills in Actual start.
  • On an In Progress order the Start button is no longer there: you record quantities with Produce.

Note: a Draft order cannot be started. Confirm it first, as explained in Confirm an order and check component availability.

Strict and flexible consumption

The order's Consumption Mode decides whether you can record more than the planned quantity. The default is strict consumption.

  • Strict (exact BoM quantities): the sum of recorded quantities cannot exceed the To produce quantity. The Done column of the components does not exceed the Demand quantity.
  • Flexible (allow over/under): you can record more than the planned quantity. Components grow in proportion, even beyond what was required.
  • Warning (warn on deviation): like flexible, it does not block recording beyond the planned quantity.

If the bill of materials must be followed exactly, as for Fig jam 340 g, choose Strict (exact BoM quantities). If the yield varies, as in olive milling, choose Flexible (allow over/under).

Starting a manufacturing order

Starting an order marks the beginning of production.

  1. Open the order from Manufacturing › Manufacturing Orders, for example MO/00009, the milling of 20 l of Bulk extra-virgin olive oil (litre), in the Confirmed status.

Page of confirmed manufacturing order MO/00009

  1. Press Start.

The message Production started appears. The status becomes In Progress, Actual start shows the moment of start, and the page shows Mark Done, Check Availability and Produce.

Order MO/00009 after Start, in the In Progress status

Note: Start on the manufacturing order does not start the work orders. Each work order is started separately from its icon in the Work Orders section.

Recording produced quantities

Record quantities each time a part of the production is ready.

  1. Open the order from Manufacturing › Manufacturing Orders, for example MO/00004, Fig jam 340 g, with 12 jars produced out of 30.

Page of manufacturing order MO/00004 in progress

  1. Press Produce. The Record Production window opens.

Record production window for order MO/00004

  1. Fill in the fields and press Produce. To close without recording, press Cancel.

The message Production recorded appears.

Order MO/00004 after recording 6 jars

Fields of the Record Production window:

  • Quantity: how much you produced in this recording. The field proposes the quantity still to produce: on MO/00004 it proposes 18, that is 30 minus the 12 already recorded. If you made only 6 jars, type 6. It must be greater than zero.
  • Lot / Serial Number: the lot of the finished product, if the product is tracked. The proposed value is None. Alternatively, choose an existing lot; lots can be checked in inventory, as explained in Check warehouse stock for components, finished products and minimum levels.

What happens at each recording:

  • Quantity produced increases by the recorded quantity and Progress updates.
  • The Done column of each component grows in proportion to the recorded quantity compared with the To produce quantity. With 6 jars out of 30, each component advances by one fifth of what is required.
  • Any by-products grow in the same way.
  • Stock levels do not change yet: components and finished products move when you mark the order as completed.

Important: with Strict (exact BoM quantities) mode, the recording fails if the total quantity exceeds the To produce quantity.

When production is finished, close the order as explained in Complete a manufacturing order and handle the backorder. If the order is no longer needed, see Cancel a manufacturing order.

Order page properties

The Details section of the page summarises the order's quantities, dates and locations.

  • To produce: the quantity planned by the order.
  • Quantity produced: the sum of quantities recorded with Produce.
  • Progress: a bar and a percentage, the quantity produced compared with the quantity to produce. MO/00004 with 12 out of 30 is at 40%.
  • Source document: what the order originates from, such as the parent order. MO/00009 has MO/00005 as its source document.
  • Planned start: the planned start date. A Confirmed or In Progress order with this date in the past is late.
  • Actual start: filled in automatically when the order moves to In Progress, with Start or with the first recording.
  • Finished: filled in automatically when the order is completed.
  • Source location: where the components are taken from.
  • Destination location: where the finished product goes in.

← Previous

Confirm an order and check component availability

Next →

Complete a manufacturing order and handle the backorder

On this page

Book a demo

See it on your company, not on a slide deck.

In 30 minutes we map the software you use today.We show you how much work and how much margin Archimedes gives back.

Show me on my business →
No commitmentReply within one working day