Confirm an order and check component availability
Manufacturing · 10 of 15 · 6 min read
When you confirm a Draft manufacturing order, the order becomes ready to work on: the system generates the components, finished products and work orders, and reserves the available components in stock. The availability check shows, for each component, how much is needed, how much is there and how much is missing.
What happens on confirmation
A Draft order does not yet have components or work orders. The order's sections show No components (confirm the order to generate them) and No work orders (confirm the order to generate them from the BoM operations).
- The order lines come from the bill of materials at the moment of confirmation. So check the bill of materials before confirming. If the order has no bill of materials, you cannot confirm it.
- Confirmation reserves the available components straight away. When there are not enough, the order stays Partially Reserved. Components that are already reserved are not given to other transfers. If you cancel the order, the reservations are released.
- If a component that has its own normal bill of materials is short in stock, confirmation creates a child order by itself for the missing quantity. This order has as its source document the order you confirmed. You do not need to create it by hand.
- If the component is a Kit-type bill of materials, confirmation creates no order. The kit is already split into its components: for example, in MO/00005 you find Glass bottle 0.5 l, Non-refillable cap and Farm label.
Confirming a manufacturing order
You can confirm an order from its page, as long as it is in Draft.
- Open the order from Manufacturing › Manufacturing Orders. For example MO/00007: Farm Flavours gift basket, bill of materials BOM/00006, quantity to produce 12.

- Press Confirm. The message Manufacturing order confirmed appears.

Next to the title two badges appear:
- Confirmed: this is the order's new status.
- Reserved or Partially Reserved: says whether all the components are reserved or only some. MO/00007 is Partially Reserved.
The buttons at the top become Produce, Mark Done and Start. To start production and record the quantities, read Start production and record produced quantities.
Components section
The Components section has one line for each component of the bill of materials, with the quantities multiplied by the order quantity.
- Component: the product the order consumes.
- Demand: the quantity the order needs.
- Done: the quantity already consumed. After confirmation it is 0.
- Status: for example Reserved or Partially available.
Here are the components of MO/00007 after confirmation:
| Component | Demand | Done | Status |
|---|---|---|---|
| [OLIO-050] Farm extra-virgin olive oil 0.5 l | 12 | 0 | Reserved |
| [CONS-001] Tomato passata 700 g | 12 | 0 | Reserved |
| [CONS-002] Fig jam 340 g | 24 | 0 | Partially available |
| [VINO-001] Hills Chianti 0.75 l | 12 | 0 | Reserved |
| [IMB-CESTO] Wicker basket | 12 | 0 | Partially available |
Finished Products section
The Finished Products section shows what the order produces, with the Demand and Done quantities. For MO/00007 there is one line: [CESTO-001] Farm Flavours gift basket, Demand 12, Done 0, status Confirmed.
If the bill of materials has by-products, these appear here too. MO/00009 has [MP-OLIO] Bulk extra-virgin olive oil (litre), Demand 20, and the by-product [MP-SANSA] Olive pomace (kg), Demand 100.
Work Orders section
The Work Orders section has one line for each operation of the bill of materials. Each line shows the work center, the expected duration, the actual duration and the status. In the Actions column, the start icon starts the work order.
- In MO/00007 there is Assembling the basket at the Basket packing bench, 15 min expected, status Ready.
- In MO/00005 there are Bottling (90 min, Ready) and Capping and labelling (50 min, Pending), both at the Bottling line.
The child order for a missing component
When you confirm MO/00007, the Fig jam 340 g is not enough: 24 are needed and the line is Partially available. The jam has its own bill of materials, so confirmation creates MO/00010 by itself: 18 Fig jam 340 g, that is only the missing quantity. The source document of MO/00010 is MO/00007.
MO/00010 starts in Draft. To start its production, confirm it with the same procedure.
Note: MO/00009 was created the same way. It is the milling of 20 l of Bulk extra-virgin olive oil (litre) and its source document is MO/00005, the order for 100 bottles of Farm extra-virgin olive oil 0.5 l. The 20 l are the quantity missing for MO/00005: 50 l are needed and there are 30 l in stock.
MO/00009 consumes 140 of [MP-OLIVE] Oil olives (kg) and has two work orders at the Olive mill: Crushing and malaxing (48 min, Ready) and Separation and filtering (12 min, Pending). Its planned start is Oct 29, 2026 and it is still Confirmed, so it is late. An order is late when it is Confirmed or In Progress and the planned start date has passed.
Checking component availability
Check Availability compares the needed quantity of each component with the free quantity in the source location and shows what is missing. It helps you decide whether to start an order or wait for a component.
- Open the order from Manufacturing › Manufacturing Orders, for example MO/00005.
- If the order is Confirmed, press More actions and then Check Availability. If the order is In Progress, press Check Availability next to Mark Done and Produce.
Above the Components section the Component Availability section appears.

The columns of the section:
- Component: the component of the bill of materials.
- Needed: the quantity the order needs.
- Available: the free quantity in the source location.
- Shortage: the quantity that is missing. If nothing is missing, the column shows a dash.
For MO/00005 (100 bottles of Farm extra-virgin olive oil 0.5 l) 20 l of bulk oil are missing:
| Component | Needed | Available | Shortage |
|---|---|---|---|
| [MP-OLIO] Bulk extra-virgin olive oil (litre) | 50 | 30 | 20 |
| [IMB-BOT05] Glass bottle 0.5 l | 100 | 300 | - |
| [IMB-TAPPO] Non-refillable cap | 100 | 300 | - |
| [IMB-ETI] Farm label | 100 | 500 | - |
For MO/00004 (Fig jam 340 g, In Progress) 6 jars are missing:
| Component | Needed | Available | Shortage |
|---|---|---|---|
| [MP-FICHI] Fresh figs (kg) | 8 | 20 | - |
| [MP-ZUCC] Cane sugar (kg) | 3 | 10 | - |
| [MP-LIMONE] Lemons (kg) | 0.5 | 2 | - |
| [IMB-VASO] Glass jar 340 g with lid | 30 | 24 | 6 |
| [IMB-ETI] Farm label | 30 | 500 | - |
Tip: the missing bulk oil for MO/00005 is covered by MO/00009. When you complete MO/00009, the oil produced goes into stock. Then repeat the check on MO/00005. To check component stock levels, read Check warehouse stock for components, finished products and minimum levels.
See it on your company, not on a slide deck.
In 30 minutes we map the software you use today.We show you how much work and how much margin Archimedes gives back.
Show me on my business →What industry are you in?
One tap — it lets us prepare the demo around your world.
What tools do you use today?
Pick the ones you recognise — or just type them. It helps us show you how they migrate.
Last step: your details.
We reply within one working day — and right after, if you like, you pick the demo slot yourself.
We couldn't send your request. Try again, or write to us at [email protected].
By sending, you agree to your data being processed so we can get back to you about the demo. Privacy notice.
Preview form — nothing is sent from this page.
Want to schedule the demo now?
Your call: book the slot you prefer yourself, or we'll call you to arrange it.
Live availability, 30 minutes, instant confirmation. The calendar opens in a new tab.
Lock in your slot ↗We'll get back to you within one working day — and we'll join the call already knowing your world.
The calendar is open in another tab: pick a slot and the demo is booked. Can't see it? Reopen it ↗
Preview page: nothing was sent.
Our calendar is live: take the slot that suits you and the demo is booked. 30 minutes, instant confirmation, no waiting.
Lock in your slot ↗