Manufacturing

  • Manufacturing

  • Reading the production dashboard

  • Setting up work centers (olive mill, kitchen workshop)

  • Viewing the bills of materials list

  • Create a bill of materials with components and operations

  • Managing by-products and kits in bills of materials

  • Calculate the cost and view the structure of a bill of materials

  • Finding manufacturing orders and filtering them by status

  • Create a manufacturing order

  • Confirm an order and check component availability

  • Start production and record produced quantities

  • Complete a manufacturing order and handle the backorder

  • Following work orders at work centers

  • Cancel a manufacturing order

  • Check warehouse stock for components, finished products and minimum levels

All modules

Reading the production dashboard

Manufacturing · 2 of 15 · 4 min read

The production dashboard summarizes in one page the status of manufacturing orders and the work of the work centers. It shows how many orders are to be confirmed, in progress or late, which work centers are busy, and which products to make to get back above the minimum stock.

Opening the dashboard

The dashboard is the first page of the Manufacturing module. Open Manufacturing › Dashboard: the page has the header Manufacturing.

The production dashboard with the number cards, the recent orders, the work center load and the production suggestions

In the header, the New MO button creates a manufacturing order without going through the orders list.

The number cards

At the top, the dashboard shows six cards. Each has a number and a label. The numbers update every time you open the page.

  • Total MOs: all manufacturing orders, in any status. In the demo there are 9.
  • Draft: draft orders, still to be confirmed. In the demo there are 2: MO/00006 and MO/00007.
  • Confirmed: confirmed orders not yet started. In the demo there are 2: MO/00005 and MO/00009.
  • In Progress: orders in progress. In the demo there is 1: MO/00004.
  • Done Today: orders completed today. In the demo there is 1: MO/00003, the Tomato passata 700 g.
  • Late: late orders. In the demo there are 2: MO/00004 and MO/00009.

An order is late when it is confirmed or in progress and the planned start date has already passed. A draft order is never late, even if its date has passed.

Tip: if Late is greater than zero, open the late orders and use Check Availability to check whether any component is missing.

The recent orders table

Below the cards, the Recent Manufacturing Orders table lists the latest manufacturing orders. Press an order's row to open its page.

The columns are:

  • Reference: the order reference.
  • Product: the product to make, with the code in square brackets, for example [CONS-002] Fig jam 340 g.
  • Qty: the quantity to make.
  • Produced: the quantity already produced. For MO/00004 it is 12 of 30.
  • Status: the order status: Draft, Confirmed, In Progress, Done or Cancelled.

If there are no orders yet, the table shows the message No manufacturing orders yet.

Work center load

The Work Center Load panel shows how many work orders load each work center. In the demo it lists Olive mill, Kitchen workshop, Bottling line and Basket packing bench.

Next to the name of each work center, one of these indications appears:

  • a badge with a number and the word pending: the work orders waiting on that work center;
  • a badge with a number and the word active: the work orders in progress on that work center;
  • Idle: the work center has no work orders pending or in progress.

If a work center has work orders both pending and in progress, it shows both badges. If no work center is configured, the panel shows No work centers configured. To create and edit work centers, see Setting up work centers (olive mill, kitchen workshop).

Production suggestions

The Production Suggestions panel proposes the products to make to get back above the minimum stock. It appears only when there is at least one suggestion.

A product appears among the suggestions when:

  • it has an active normal bill of materials;
  • it has a reorder rule;
  • its free stock has fallen below the minimum of the rule.

For each product the panel shows the name and the quantity to make, followed by the word units. The quantity brings the stock up to the maximum of the rule. If the rule has no maximum, it brings the stock up to the minimum.

In the demo, [CONS-002] Fig jam 340 g (54 units) and [CESTO-001] Farm Flavours gift basket (8 units) appear. To see the reorder rules, see Check warehouse stock for components, finished products and minimum levels.

Note: a suggestion does not create an order. To make the proposed quantity, create an order with New MO.

← Previous

Manufacturing

Next →

Setting up work centers (olive mill, kitchen workshop)

On this page

Book a demo

See it on your company, not on a slide deck.

In 30 minutes we map the software you use today.We show you how much work and how much margin Archimedes gives back.

Show me on my business →
No commitmentReply within one working day